• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2019 - Jun 2020
  • Estimated project cost $826,234
  • Australian Government contribution $690,210
  • Local Council/Shire Coffs Harbour City Council
  • State NSW

Project description

The road contains piecemeal kerb and gutter infrastructure, which is off very poor condition The pavement width is inadequate, approximately 4m narrower than existing kerb and gutter Significant pavement and surface failures on the road with inadequate pavement thickness and grading

Renew kerb and gutter and provide consistent kerb and gutter from Beach Rd to End. Box out and replace pavement with high quality granular pavement Provide a 2 coat spray sealed surface to the pavement.

Total cost of proposed project is $826,234

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.