• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2020 - Sep 2020
  • Estimated project cost $181,394
  • Australian Government contribution $181,394
  • State NT

Project description

Prone to flooding and impassable, Residents are cut off from outside services when roads flood for several months each year.No emergency services can gain access. Roads are dangerous, larger washouts, narrow crossings making getting larger equipment in dangerous. Flood water 1.5 metres of crossing many times during the wet season, Road is impassable and community residents cut off from outside services. Peppimenarti Road is the only access to the Community

Reinforced Concrete Box Culverts – dimensions 1200mm wide x 600mm high. Road design solution: Install 2/1200 x 600 Reinforced Concrete Box Culverts, install 9 metre wide concrete floodway over Reinforced Concrete Box Culverts at 1.0 metre above existing level, raise approach formation length XI = 160 mtr XO = 120mtr start point chainage 600 mtrs from Port Keats Rd, end point chainage 980 mtrs from Port Keats Rd at Peppimenarti Raod, total length of road works 380 metres

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.