• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2020 - Apr 2020
  • Estimated project cost $85,518
  • Australian Government contribution $85,518
  • Local Council/Shire Corporation of the City of Whyalla
  • State SA

Project description

Cracking on surface extends across full width of road. Localised areas with patching from previous repairs is in poor condition. Most likely retains water and could cause further damage after significant rainfall

Propose to perform full width area profile. Replace top surface with 40mm hot mix. Perform pavement patching as required in some areas.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.