• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2020 - Mar 2020
  • Estimated project cost $48,000
  • Australian Government contribution $30,000
  • Local Council/Shire City of Subiaco
  • State WA

Project description

Pavement fatigue failure reflecting in the form of structural/environmental cracking including oxidation of bitumen due to ageing of wearing surface.

Profiling the existing pavement by 30mm and replacing it with 30 mm thick Dense Graded Asphalt mix designed to include 15% or more Reclaimed Asphalt Pavement (RAP), Total length -166 metres, Average width - 6.0 metres, Total area- 996 m2.

Total cost of proposed project is $48,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.