• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2020 - May 2020
  • Estimated project cost $384,442
  • Australian Government contribution $384,442
  • State NSW

Project description

The existing road surface is affected by various types of cracks and spalling along joints. Some sections of kerb and gutter have been displaced by tree roots and heavily cracked.

The proposed work will include replacement of damaged sections of kerb and gutter, strengthening of existing pavement in trafficable areas and resurfacing of the road with asphalt. Length = 273 m; Width = 12 m; Area = 3276 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.