• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2020 - Apr 2020
  • Estimated project cost $152,128
  • Australian Government contribution $152,128
  • Local Council/Shire Shire of Wiluna
  • State WA

Project description

Problem Being Addressed Very sandy area and the existing material on the road is not strong enough to stand up to heavy vehicle traffic. The road has deteriorated to the point where it doesn't have a 6 metre width. This has become a safety concern and requires urgent works.

Gravel resheeting to 8 metres wide at a 150 millimetre depth with gravel sourced from the gravel pit 30 kilometres north west of the project.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.