• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2019 - Dec 2019
  • Estimated project cost $27,280
  • Australian Government contribution $27,280
  • Local Council/Shire Rural City of Murray Bridge
  • State SA

Project description

Siesta Drive is located at the edge of the Murray River Flood Plain and therefore subject to significant changed in moisture conditions. To locations along Siesta Drive are experiencing significant localise failures that require remediation and pavement reconstruction. Remediation of these to isolated sections of Siesta Drive will return the road segment to a satisfactory condition in lime with Council Asset Management Plan and level of service.

Remove existing seal and pavement, stabilise the subgrade, reconstruct the pavement and seal to eliminate surface defects and pavement deformation

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.