• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2020 - Mar 2020
  • Estimated project cost $53,854
  • Australian Government contribution $53,854
  • Local Council/Shire Glamorgan Spring Bay Council
  • State TAS

Project description

Existing timber bridge deck has failed. Load limit of 5 tonne applied (30/05/2019). Addressing local farmer and resident access.

It is proposed to replace the existing timber deck with precast concrete deck slabs with concrete kerbs and guide posts. Remove current 5 tonne load limit.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.