• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2020 - Jul 2020
  • Estimated project cost $203,948
  • Australian Government contribution $203,948
  • State NSW

Project description

The existing road surface is affected by various pavement defects. The existing surface is old and delaminated in many areas which makes the existing surface extremely rough. It is prone to development of potholes and cracks. Some sections of kerb and gutter have been displaced and heavily cracked.

The proposed work will include replacement of damaged sections of kerb and gutter, repair of pavement failures by heavy patching and resurfacing of the road with asphalt. Length = 550 m; Width = 8.4 m; Area = 4620 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.