• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2020 - Jan 2023
  • Estimated project cost $223,693
  • Australian Government contribution $223,693
  • State NSW

Project description

Deterioration of aging bridge. In 2016 Props were installed with a 5 year time frame of a permanent solution being applied, to increase load limit and to give a further 5 years life to the bridge. Report in 2020 advising of continued deterioration and issue with west abutment. These results indicated the bridge is no longer able to provide the required level of service.

Replace the existing timber bridge designed to meet HML68 Tonne loading. Realign bridge to improve approach road geometry and alignment.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.