• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2021 - Mar 2021
  • Estimated project cost $70,025
  • Australian Government contribution $41,863
  • Local Council/Shire City of Subiaco
  • State WA

Project description

Fatigue failure of the wearing surface in the form of structural longitudinal cracks.

Profiling the existing pavement to 25mm depth and resurfacing it with 30 mm SMA with 7mm aggregate size. Total length-180 metres, width-6.3 metres, Average area- 1134.0 m2

Total cost of proposed project is $70,025

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.