• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jul 2020 - Jun 2021
  • Estimated project cost $478,706
  • Australian Government contribution $134,171
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

This section of road is in very poor condition and one section is only 150 milimetres above the water table during winter; no section of the road is without potholes, cracks or edge breaks. A culvert is in poor condition.

Replace the culvert with a larger diameter pipe at a higher reduced level and install headwalls. Import fill to lift the level of the road, import gravel and shape the road to the required crossfall and super-elevation with a 6 metre wide seal and a 1 metre unsealed shoulder each side. Place signs and guide posts as required.

Total cost of proposed project is $478,706

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.