• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2020 - Dec 2020
  • Estimated project cost $46,462
  • Australian Government contribution $46,462
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

Very little gravel exists on the road; the shape is poor (very flat) which results in potholes during winter. The surface corrugates during summer.

Shape the existing road to form a base with 6 percent crossfalls. Import gravel to form a 100 milimetre thick compacted layer.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.