• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2021 - Jun 2021
  • Estimated project cost $332,573
  • Australian Government contribution $259,086
  • Local Council/Shire District Council of Karoonda East Murray
  • State SA

Project description

Base material has worn down on the existing surface and requires re-sheeting. Currently the road is too narrow with water run-off pooling on road verges.

Re-sheet 11km of road from the intersection with Perponda Road and heading north easterly and finishing at the intersection with Goondooloo Road. 6m wide x 100mm thick. Construct appropriate storm-water drainage on road verge to allow for water run off.

Total cost of proposed project is $332,573

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.