• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2019 - Nov 2019
  • Estimated project cost $148,248
  • Australian Government contribution $148,248
  • Local Council/Shire Balranald Shire Council
  • State NSW

Project description

Road surface is extremely dusty and bogy due to loose material. The road level is below natural surface in a low lying area with poor drainage. Road becomes impassable in wet conditions.

To form and build the road up to natural surface with natural material. Then gravel construction 8m wide for a length of 8.0km. This will include grading along the sides of the road to form table drains for drainage flow.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.