• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2020 - Jun 2021
  • Estimated project cost $1,306,824
  • Australian Government contribution $1,306,824
  • State NSW

Project description

The existing flood way which is 500m long is frequently washed away with the flood and the 50km road network has bull dust holes and corrugations. Efter the completion of the projects the flood way will become better and the bull dust wholes and corrugations will be repaired.

Rip and compact 100mm of the existing pavement 8m wide for 500m length. 200mm gravel overlay on the flood way, stabilise and seal. Put rock boulders on upstream and downstream side with cement slurry binder. Foramation grading of 50km of road network.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.