• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2020 - Sep 2021
  • Estimated project cost $953,000
  • Australian Government contribution $336,000
  • Local Council/Shire South Australian Local Government Grants Commission
  • State SA

Project description

The Section of road requires pavement reconstruction (deeplift reseal) due to its failed pavement and surface. The road surface suffers from heavy rutting and is in a 50km per hour zone having a large amount of interaction between commuter vehicles, tourism traffic, public transport buses, cyclists and pedestrians.

The work proposed includes re-kerbing both sides of the road, as most of the kerbing is in poor condition and surface water pools in many locations, contributing to the pavement and surface failures. This will alleviate the water pooling issues currently and will also assist in creating a saferenvironment for pedestrians, cyclists and vehicles. Therefore, new kerbing will be laid both sides of the road, followed by a deeplift reseal of the road surface.

Total cost of proposed project is $953,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.