• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2021 - Jan 2021
  • Estimated project cost $339,431
  • Australian Government contribution $255,000
  • Local Council/Shire The Corporation of the City of Adelaide
  • State SA

Project description

The asphalt surfacing on the Victoria Bridge is in poor condition. This surfacing reduces the ride quality of the road and allows water to permeate to the structure below. Crack sealing has been undertaken to mange water ingress, however a more permanent solution is now required.

Resurface the bridge deck with 50mm asphalt surface and a waterproof membrane.

Total cost of proposed project is $339,431

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.