• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2021 - Jun 2021
  • Estimated project cost $154,033
  • Australian Government contribution $150,000
  • Local Council/Shire Wodonga City Council
  • State VIC

Project description

Road pavement shows significant areas of failure, including shoving, cracking and potholing. Kerb and channel has displaced and holds water in some places. High maintenance costs associated with ongoing inspection and repair. Road safety associated with potholed and shoved pavement.

Road reconstruction, including removal and replacement of 890sqm of existing old and failed seal, pavement & subgrade replacement as required, removal and replacement of approximately 220m of kerb and channel, remove and replace associated concrete driveway and footpath pavement to match new kerb where required. Reconnect house drain connections and reset stormwater inlet pits to match new kerb. Prepare and place initial 7mm stone seal and 30mm hotmix final seal.

Total cost of proposed project is $154,033

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.