• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2020 - Dec 2020
  • Estimated project cost $113,282
  • Australian Government contribution $113,282
  • Local Council/Shire Leeton Shire Council
  • State NSW

Project description

Road Safety is the major concern on this road. the existing pavement is narrow, in poor condition with significant edge breaks and localised pavement failures. this section of the road is part of a school bus route.

Works will include the full rehabilitation and subgrade stabilisation of the roadway and reinstatement of a 2 coat bitumen seal to a width of 6m. it will include required table drain works.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.