• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2021 - Jun 2021
  • Estimated project cost $60,716
  • Australian Government contribution $60,716
  • State NSW

Project description

The existing road surface is affected by numerous cracks and pavement failures. It has been patched extensively in the past. The existing surface is old and brittle and prone to development of potholes.

The proposed work includes repair of failed pavement failures by heavy patching and resurfacing of the road with asphalt. Length = 145 m; Width = 9.2 m; Area = 1334 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.