• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2021 - May 2021
  • Estimated project cost $97,207
  • Australian Government contribution $97,207
  • Local Council/Shire City of Greater Geelong
  • State VIC

Project description

The road surface and pavement has lost its shape and is showing signs of cracking distress due to severe wheel rutting caused by use of increased heavy commercial traffic

The supply and placement of 100mm thick deep lift asphalt layer to structurally enhance the pavement followed by a sealing membrane overlay called FibreDeck to assist with water proofing of pavement. Total works 0.67kms (670 metres long) and 6 metres wide

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.