• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2021 - Apr 2022
  • Estimated project cost $230,000
  • Australian Government contribution $230,000
  • Local Council/Shire City of Swan
  • State WA

Project description

Blackburn Street has extensive structural cracking along its full length and width, which is well beyond the scope of general maintenance. Core testing results showed that the pavement thickness is inadequate, hence a rehabilitation treatment is required.

Foamed bitumen stabilisation of existing pavement to a depth of 200mm, lay tack coat and lay 30mm of SMA. In addition, replace existing non-standard. kerbing with mountable kerbing

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.