• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2022 - May 2022
  • Estimated project cost $134,501
  • Australian Government contribution $134,501
  • State NSW

Project description

The existing surface is old and brittle. It is affected by cracks, pavement failures and old repair patches. Some sections of kerb and gutter have been damaged and displaced by tree roots.

The proposed work includes repair of displaced and damaged sections of kerb and gutter, repair of failed pavement areas and resurfacing of the road with asphalt. Length = 340 m; Width = 11 m; Area = 3740 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.