• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2022 - May 2022
  • Estimated project cost $67,940
  • Australian Government contribution $67,940
  • State NSW

Project description

The existing road surface is affected by various surface defects that include cracking, delamination and disintegration of asphalt and structural pavement failures. Some sections of kerb and gutter have been damaged.

The proposed work includes repair of damaged sections of kerb and gutter, repair of pavement failures by patching and resurfacing of the road with asphalt. Length = 220 m; Width = 8.2 m; Area = 1804 m2

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.