• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2021 - Nov 2023
  • Estimated project cost $1,249,936
  • Australian Government contribution $479,000
  • Local Council/Shire Lachlan Council
  • State NSW

Project description

Existing seal has reached the end of its life with pavement failures and major cracking. Existing storm water system is insufficient to drain heavy rain event away quicker which result in pavement becoming saturated result in more failures in the pavement.

The storm water system will be upgraded and new kerb and gutter will be installed where required. The failed areas of the pavement will be reconstructed and the full length of the road will be resealed. Council will also separately fund and construct a new footpath.

Total cost of proposed project is $1,249,936

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.