• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2021 - Jun 2022
  • Estimated project cost $15,740
  • Australian Government contribution $15,740
  • Local Council/Shire Shire of Nungarin
  • State WA

Project description

The culvert is to small for the volume of water that flows through which inturn overflows onto the road eroding it away. The current drainage is inadequate and does not allow water to flow efficiently out into the existing dam.

Replace existing culvert with a larger and longer one. Install correct headwalls and rock reinforcement to prevent erosion. Drainage to upgraded to allow water to flow correctly. Resheet with gravel over the area to repair the road correctly.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.