• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2021 - Jun 2023
  • Estimated project cost $337,074
  • Australian Government contribution $337,074
  • Local Council/Shire Huon Valley Council
  • State TAS

Project description

Existing road pavement is indicating signs of fatigue from the traffic impacts of this collector road. This road provides a primary link between the Channel Highway and the coastal townships of Abels Bay, Eggs and Bacon Bay and Randalls Bay. This is a high use road in summer by many holiday home owners.

Repair pavement defects, edge breaks and required correction material prior application of a single coat 5.50m wide and 2,795m long polymer modified binder seal. Clean table drains, install guideposts and signage as required.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.