• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2021 - Mar 2022
  • Estimated project cost $215,481
  • Australian Government contribution $200,000
  • Local Council/Shire Town of Gawler
  • State SA

Project description

The road exhibits serious pavement defects and issues beyond the scope of periodic maintenance intervention, including heavy rutting, crocodile cracking, surface depressions due to existing thin and weak road base and surface stormwater drainage and ponding issues on the road over the years, as there was no underground Stormwater drainage system until up to two years ago.

Reconstruct the road pavement thicker and strong using standard pavement materials, seal the reconstructed road pavement with 30mm thick asphalt surface layer and line mark at intersections.

Total cost of proposed project is $215,480

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.