• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2021 - May 2022
  • Estimated project cost $449,030
  • Australian Government contribution $149,030
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

The existing road has a single width seal, has significant rutting, cracking, sections with poor crossfall, potholes and pothole patches. Storm water culverts are in poor condition and require replacing.

Place a second coat spray seal over the first 1 kilometre. Replace drainage culverts as required, remove a small number of trees, construct an 8 metre wide road and place a 6 metre wide spray seal.

Total cost of proposed project is $449,030

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.