• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2021 - May 2022
  • Estimated project cost $450,000
  • Australian Government contribution $156,121
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

The existing road is rutted, has cracks and potholes and poor crossfalls. The existing stormwater culvert has insufficient cover over it and the pipes are dislodged.

Replace one stormwater culvert then reconstruct the road to form a 10 metre wide pavement and place an 8 metre wide spray seal surface.

Total cost of proposed project is $450,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.