• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2023 - Apr 2023
  • Estimated project cost $556,029
  • Australian Government contribution $556,029
  • Local Council/Shire Sutherland Shire Council
  • State NSW

Project description

Pavement is showing signs of pavement deformation and failures (meandering cracks); significant increase in pavement roughness. Rehabilitation of road pavement is required.

Full width reconstruction of road pavement (900m length x 8.5m wide). Work includes 250mm thick foam bitumen stabilised base layer with 40mm asphalt concrete wearing surface

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.