• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2022 - Jan 2023
  • Estimated project cost $923,725
  • Australian Government contribution $477,167
  • Local Council/Shire Hobsons Bay City Council
  • State VIC

Project description

Kerb and channel has subsided along the length of street and holds water in many locations. The kerb and channel needs to be reconstructed and new drainage installed. Cracking has occurred and the road pavement surface is breaking up. The pavement has also lost shape with failures along length of street and requires full reconstruction to address failures and loss of shape and safety risk to all users.

Reconstruction of kerb and channel, installation of new/upgrade drainage and full width reconstruction of road pavement and asphalt surface to current standards.

Total cost of proposed project is $923,725

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.