• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2022 - Oct 2023
  • Estimated project cost $533,368
  • Australian Government contribution $485,000
  • State NSW

Project description

The road pavement has been deteriorated with the evidence of crocodile cracks over large area and potholes in different places. The pavement requires repair and resurfacing. Some sections of the kerb and gutter also have been damaged or uplifted, which require replacement.

Th project includes rehabilitation and resurfacing of the road pavement, reconstruction of damaged sections of kerb and gutter and adjustments of associated vehicular crossings and replacements of drainage pit lintels and grates.

Total cost of proposed project is $533,368

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.