• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2022 - Dec 2022
  • Estimated project cost $91,237
  • Australian Government contribution $91,237
  • Local Council/Shire Wangaratta Rural City Council
  • State VIC

Project description

Water pooling on road due to failure of exiting kerb and channel

Propose to reinstate 181m kerb and channel. The works include installation of concrete vehicle crossings, sub drainage, replacement of B2 kerb and channel and construction of asphalt overlay including saw cut, removal, application of prime seal and 30mm asphalt to a width between 0.9m and 3.50m.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.