• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jul 2023 - May 2024
  • Estimated project cost $1,000,000
  • Australian Government contribution $740,291
  • Local Council/Shire City of Cockburn
  • State WA

Project description

Flooding issues in which the stormwater drainage pipe network is under capacity. There is also a trapped low point with no overland flow path, which caused flooding to a nearby property during an intensive storm event.

Upgrade to the Drainage capacity of the pipe infrastructure to cater for a 1 in 100 storm event. Infrastructure within the road reserve of Stratton Road leading to the drainage sump on Hurford Street .

Total cost of proposed project is $1,000,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.