• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2023 - Mar 2024
  • Estimated project cost $1,600,000
  • Australian Government contribution $817,982
  • Local Council/Shire Kingston City Council
  • State VIC

Project description

Flexible road pavement is in poor condition and has failed for approximately 60% of the roads length; it has extensive cracking rutting and heaving failures and asphalt re-sheet is required. The works also include the reconstruction of footpaths along both sides of the length of this section as well as drainage upgrade works.

The Proposed scope of works will involve, reconstruct the existing road pavement together with upgrade of street drainage, replacement of kerb and channel, vehicle crossings and footpaths.

Total cost of proposed project is $1,600,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.