• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2023 - Feb 2024
  • Estimated project cost $315,000
  • Australian Government contribution $168,192
  • Local Council/Shire Fairfield City Council
  • State NSW

Project description

The road is affected by some failure of road base, depressions and various types of cracks.

The proposed treatment includes provision of subsoil drainage system along the kerb and gutter on the northern side, the rectification of failed areas and resurface with rubberised seal and hot mix asphalt. Length = 308 m, Width =12.1m, Area = 3750 m2.

Total cost of proposed project is $315,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.