• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2023 - Dec 2023
  • Estimated project cost $227,172
  • Australian Government contribution $227,172
  • Local Council/Shire Leeton Shire Council
  • State NSW

Project description

Asset Management and Road Safety are the two main contributing factors for the inclusion of this road in the R2R program. The existing pavement is in poor condition and quite narrow with large drop offs. This makes it unsafe for passing vehicles or overtaking, it also creates a continuous need for edge repairs and shoulder drop offs.

Works will include a gravel overlay and insitu mixing with proposed increase to 5.5m in width. The works will be completed with a 2 coat Bitumen Seal

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.