• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2023 - Mar 2024
  • Estimated project cost $267,655
  • Australian Government contribution $267,655
  • Local Council/Shire Shire of Yilgarn
  • State WA

Project description

The existing road surface is made up principally of loose sand and clay-based material that is slippery when wet.

To rectify this problem, it is proposed to carry out a Gravel Sheeting program on this road. This work involves importing of gravel from designated gravel pits and improving the road surface drainage to provide an all-weather road. Project length 5,200 metres. Project width 9 metres.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.