• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2024 - Apr 2024
  • Estimated project cost $204,822
  • Australian Government contribution $20,492
  • Local Council/Shire City of Port Phillip
  • State VIC

Project description

Deformed asphalt surface has been identified through road inspections. The pavement surface has changed from the originally constructed profile which may directly influence the riding quality, water ponding and skid resistance. Resurfacing this road will improve road performance with regards to strength and riding quality

40mm thick size 10 asphalt wearing course along 105m and width 13.0m (Area = 1365m2),

Total cost of proposed project is $204,822

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.