• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2023 - Jun 2024
  • Estimated project cost $1,226,739
  • Australian Government contribution $613,000
  • Local Council/Shire Banana Shire Council
  • State QLD

Project description

Deterioration of road surface with rutting and corrugation along road surface, also damage to floodway located at Chainage 2.15 (concrete floodway and rock protection needs replacement).

Grade the existing surface to shape with the addition of 150mm of gravel to surface, replacement of concrete floodway and rock protection at chainage 2.15 and overlay of concrete floodway at chainage 5.9.

Total cost of proposed project is $1,226,739

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.