• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2024 - Mar 2024
  • Estimated project cost $232,912
  • Australian Government contribution $232,912
  • Local Council/Shire Shire of Dandaragan
  • State WA

Project description

Failed culverts from local ground saturation and lack of capacity.

Remove and replace existing culverts with more and larger capacity pipes, lime stabilise affected area, import gravel road base then mix and compact. Install a sub-soil drain on road verge to catch ground water and deliver it to the culverts and creek line. The covering seal will be a 2 coat 7mm over 14mm stone with a C170 bitumen.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.