• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2023 - Dec 2023
  • Estimated project cost $47,683
  • Australian Government contribution $47,683
  • Local Council/Shire Shire of Victoria Plains
  • State WA

Project description

Weak sections of the road have been identified that have a higher moisture content through a boggy / swampy type base course which when this moisture rises will cause the road to fail with pot holes etc. The cement stabilization will provide a stronger layer over the top of the seal and to a wider width.

It is proposed to cement stabilise this section of the road over the top of proposed seal to a width of 10m.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.