• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2024 - Jun 2024
  • Estimated project cost $1,720,000
  • Australian Government contribution $1,315,573
  • Local Council/Shire South Burnett Regional Council
  • State QLD

Project description

The current road pavement has multiple defects (stripping, flushing, cracking, rutting, potholes) due to inadequate under road stormwater drainage, poor table drainage, and low strength sub grade and pavement materials.

The existing road pavement to be widened to achieve a minimum pavement and seal width of 8.0m on an 8.0m wide formation. The new pavement cross-section to consist of 2 x 3.5m wide traffic lanes and 2 x 0.5m wide sealed shoulders. The appropriate treatment is to rehabilitate the pavement via an insitu stabilisation process of the existing pavement, including top up where required.

Total cost of proposed project is $1,720,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.