• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2024 - Mar 2024
  • Estimated project cost $59,273
  • Australian Government contribution $59,273
  • Local Council/Shire Shire of Waroona
  • State WA

Project description

This 50m section of stormwater drainage pipe is impacting areas, where the pipe isn’t level. Causing several sections to back flow and become filled with beach sand. This results in the drains backflowing and being unable to accommodate the runoff water which is then entering the roadway.

Removal of the drainage pipe and installing a stabilised pad for the pipe. Then reinstalling 300mm pipe to prevent water not draining and flowing correctly. Reducing the risk of roadside erosion and water being over the road.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.