• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2023 - Mar 2024
  • Estimated project cost $66,770
  • Australian Government contribution $47,500
  • Local Council/Shire City of Subiaco
  • State WA

Project description

Pavement fatigue failure reflecting in the form of structural longitudinal and transverse cracks on asphalt wearing surface.

Profiling the existing pavement wearing surface by 25-30 mm and replacing it with 30 mm ( 7mm aggregate size) with Stone Mastic asphalt. Total area-2407 m2

Total cost of proposed project is $66,770

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.