• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2023 - Jun 2024
  • Estimated project cost $1,337,000
  • Australian Government contribution $892,000
  • Local Council/Shire South Australian Local Government Grants Commission
  • State SA

Project description

The project aims to improve tourism appeal, improve road user safety and sight distance due to dust related environmental and health impacts, storm water and drainage issues. Closing the gap between the current and desired construction and maintenance standard of the road.

Reshape table drains and other water management, including the installation of stormwater drainage infrastructure. Provision of culverts and crossroad drainage to coastal reserves. Road alignment geometric shape correction. Prepare foundation and provision of kerb and channel where needed. Top the reshaped alignment with PM2 pavement material and then undertake cement stabilisation strengthening with 2% GB cement to a depth of 250mm over a width of 9m followed by compaction of the same to 100% Modified MDD. Kennametal blade adhesion improvement grooving of the finished surface. Apply 10mm primer seal. Installation of traffic control devices (e.g., signage)

Total cost of proposed project is $1,337,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.