• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2024 - Jun 2024
  • Estimated project cost $320,000
  • Australian Government contribution $133,983
  • Local Council/Shire Shire of Northampton
  • State WA

Project description

During heavy rainfall events, the capacity of the existing concrete kerb surface water drainage system is exceeded and surface water flows into the road verge and adjacent private properties.

Design and construct an underground stormwater system to direct the surface water flow into the existing stormwater disposal system on the nearby Fourth Avenue.

Total cost of proposed project is $320,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.