• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2023 - Jan 2024
  • Estimated project cost $152,751
  • Australian Government contribution $133,824
  • Local Council/Shire Shire of Toodyay
  • State WA

Project description

This section of road is sealed with poor surface condition due to some significant edge breaks. The condition of the road has deteriorated and a high level of maintenance is required to keep the road safe.

This is currently a 6 metre sealed road and the works will involve the shoulder widening to eliminate the edge breaks and to increase the seal width to a 8 metre seal. This will also involve delineation of the road which includes centre line and edge line markings.

Total cost of proposed project is $152,751

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.